Project Profile
Project Description: |
Migdale hospital |
Location:Client:Project Value:Project Duration: |
Bonar Bridge, HighlandBailey Building Services£8.3mAug 2010 – May 2011 |
Migdale Hospital, Bonar Bridge
Callidus Design Limited was appointed by Bailey Building Services to carry out the detailed co-ordination of the Mechanical and Electrical Building Services in conjunction with the structural steel frame and architectural envelope. The structural steel frame, drainage & ventilation services were all represented in 3D using our in-house CAD-Duct software package. This enabled clash detection and optimisation of the services layout to enable a smooth installation process and easy access to services for the building operators.
Client: Developer: Main Contractor: Architect: Civil / Structural Engineer: M&E Services Design: M&E Contractor: M&E Building Services Coordinator: Gross Building Area : |
NHS Highland RD Health Robertson Highland Ltd Mackie Ramsay Taylor Ramsay & Chalmers Wallace Whittle Bailey Building Services Callidus Design Ltd 2100m2 |
Callidus Design were responsible for carrying out the coordination for the mechanical & electrical services associated with the above project, including the following:
- Ventilation
- Heating / LTHW
- Domestic Hot and Cold Water
- Medical Gases
- Small Power & Containment
- Comms