Project Profile
Project Description: |
Primary Care Centre |
Location:Client:Project Value:Project Duration: |
Nairn, ScotlandBailey Building Services£20mJune 2008 – Sept 2010 |
Nairn Primary Care Centre Bailey Building Services Design Coordination
Callidus Design was appointed by Bailey Building Services to carry out the mechanical & electrical building services design for the Primary Care Centre in Nairn. The end client was NHS Highland and the project was carried out under a PPP contract. The project was split into 3 separate phases of construction. The first two phases were new build, with the 3rd phase being a refurbishment of an existing building to incorporate a large dentistry suite and stand alone pharmacy.
Phase 1 Gross Internal Floor Area: | 2440m2 | Phase 1 Construction Start Date: | June 2008 | |
Phase 2 Gross Internal Floor Area: | 2510m2 | Phase 1 Completion Date: | June 2009 | |
Phase 3 Gross Internal Floor Area: | 654m2 | Phase 2 & 3 Construction start date: | August 2009 | |
Total Floor Area: | 5604m2 | Phase 2 & 3 Completion date: | September 2010 |
Client: | NHS Highland |
Developer: | Prime plc |
Main Contractor: | Morrison Construction Ltd |
Architect: | PMP Ltd / 360 Architecture |
Civil / Structural Engineer: | HGA Consulting Engineers Ltd |
M&E Contractor: | Bailey Building Services Ltd |
M&E Building Services Engineer: | Callidus Design Limited |
The Primary Care Centre, Nairn incorporates the following:
- 3No. 4 bed warded areas
- 6No. en-suite private bedroom areas
- Palliative care en-suite bedroom
- Physiotherapy suites
- X-Ray department
- Day Hospital c/w multipurpose room
- Private Treatment Rooms
- Dentistry Suite c/w 5 consulting rooms, LDU and reception area
- Standalone Pharmacy
- Minor Surgery Rooms
- 15No. GP Consulting Rooms
- 4No. GP practice nurse treatment rooms
- Interview Rooms
- 110 person waiting room
- Various Primary Care Trust (PCT) Offices
- Ambulance Bay & associated services
- Recovery Rooms
- Conference rooms, meeting rooms & staff support areas
- Staff Kitchen, In-patient kitchen & Day hospital kitchen
- Social Services department, including district nurse facility
Callidus Design were responsible for producing a fully co-ordinated design & all specification documentation for the mechanical & electrical services associated with the above project, including the following:
- Above Ground Drainage Installation
- Hot & Cold Water Services Installation
- Natural Gas Installation
- Medical Vacuum Installation
- Chilled Water Installation (serving warded area AHU’s and waiting area FCU’s)
- LTHW Boiler Plant & Heating Distribution to fan coil units & radiant panels
- HVAC Installation (including full air conditioning within all bedded areas and main waiting area)
- Low Voltage Distribution & Switchgear
- Small Power & Lighting Installation
- Fire Alarm & Detection Installation
- BMS & Controls Installation
- Intruder Detection System
- CCTV Installation
- Public Address Installation
- Data Installation
- Radio & TV Installation
- Lightning Protection Installation
- Standby Generator Installation
- Nurse Call System